metal·os
← Load board
Removal servicebiddingSX-2026-0731-9027

Grain elevator demo — mixed structural and tin

North Loop Demolition · Minneapolis, MN · 6 photos

Description

Elevator headhouse teardown. Mixed structural and heavy tin, significant volume, winter access constraints.

Material
GradeClassEst. weightReferenceIndicative value
HMS 1&2 (80/20)
ferrous63,000 lbs$322/GT$9,056
Total28.13 GT$9,056

Weights are the generator's estimate at posting. They carry no settlement weight — only a certified reading does.

Bids
Material and haul are bid separately, then paired

Bundling both sides into one all-in quote would force every yard to also solve trucking — the exact capability small yards lack. Splitting the bid lets a yard that cannot dispatch a truck still compete on price.

Material bids — yards

None yet.

Haul bids — carriers

None yet.

Clearing

No bids yet.

Generator ask: up to $1400

Site & access
Location
North Loop Demolition — Minneapolis
City
Minneapolis, MN
Gate hours
Mon–Sat 06:00–16:00
Window
2026-07-31 → 2026-08-15
Equipment
flatbed, grapple

Exact address and gate contact released to the winning carrier on award.

Exact address is released to the winning hauler on award.

Disclosures
No hazard disclosures
Generator
North Loop DemolitionT0
17 loads · 4.0 rating · since 2026-04-01
Identity Certified scale